Zavrick Contracting covers Port Coquitlam from a base one city over in Coquitlam. We paint interiors and exteriors, do finish carpentry, and hang, tape and repair drywall — with particular experience in PoCo's large stock of 1970s and 80s homes. Free on-site quotes.
Port Coquitlam had roughly 61,500 residents at the 2021 Census. It is a compact, largely low-rise city, and a large share of its single-family housing dates from a single building boom in the 1970s and 80s.
Port Coquitlam is right next door, so PoCo homeowners get the same fast response our Coquitlam neighbours do. From the established streets around Downtown PoCo and Mary Hill to the newer family homes near Citadel Heights and Riverwood, we've painted, repaired and rebuilt across the city.
PoCo's housing skews to one era more than any other city we serve, and that shapes the work. A great many of its houses went up in the 1970s and early 80s, which puts them at the point where original siding, fascia and trim need real preparation rather than another coat over failing paint — and where sprayed ceiling texture, aluminum-era windows and 40-year-old interiors are all coming due at once.
Painting, carpentry and drywall, done by the same crew from first look to final walk-through.
Neighbourhoods we cover in Port Coquitlam
Port Coquitlam is the next city over from our Coquitlam base — close enough that a quote visit rarely needs much notice.
Exterior painting spots in PoCo fill up fast once the dry season starts — reach out early in the spring.
- Mon – Sat · 9:00 AM – 6:00 PM
- Based in Coquitlam, BC
A city built mostly in one decade — and now due all at once
Downtown Port Coquitlam and Mary Hill hold the older stock, but the bulk of PoCo's single-family housing came out of the 1970s and early 80s. Citadel Heights, Riverwood and the newer pockets filled in from the late 80s onward.
A house from that boom period is typically clad in cedar, hardboard or T1-11 plywood siding, with painted wood fascia and soffits. Forty-odd years on, that cladding has usually been recoated two or three times, and each of those coats is only as sound as the one underneath it. Painting over a film that has already lost adhesion just buys a season.
That's why exterior work here is mostly prep: scraping back to a sound substrate, spot-priming every bit of bare wood, replacing the rotted sections of fascia and trim rather than filling them, and only then painting. It's the least glamorous part of the quote and the part that decides how long the job lasts.
Sprayed ceiling texture and the pre-1990 asbestos rule
Almost every PoCo house from that era has a sprayed ceiling texture — stipple, popcorn or knockdown. Two things follow from that.
The first is practical: matching an existing texture around a patch is a skill in itself, and a mismatched patch on a ceiling is more visible than one on a wall because ceilings catch raking light.
The second is a safety and legal matter. In British Columbia, buildings constructed before 1990 must be inspected for asbestos-containing materials by a qualified person before renovation or demolition work that could disturb them, and sprayed ceiling texture is one of the materials that gets flagged. We do not sand, scrape or cut into pre-1990 ceiling texture on assumption. If your ceiling is in that age bracket and the job would disturb it, testing comes first — that's WorkSafeBC's requirement, not a preference of ours.
Low ground, high water table, and where drywall damage shows up
Port Coquitlam sits low, on the flat land between the Coquitlam and Pitt Rivers, with Mary Hill as the high ground above it. Basements and crawlspaces here are where moisture problems surface first.
Water-damaged drywall is one of the most common calls we get in PoCo, and the important part is the order of operations. Replacing a damaged section before the source is found and fixed guarantees a second repair. We'll say so plainly if we think the moisture is still active, even when that means the job doesn't start that week.
Our trades in Port Coquitlam
Port Coquitlam — questions we get asked
Can you match the stipple or knockdown texture on my Port Coquitlam ceiling?
Yes — texture matching is a normal part of drywall repair here, because so much of PoCo's housing has sprayed ceilings. One condition: if the home was built before 1990, BC's occupational health and safety rules require the material to be checked for asbestos by a qualified person before anything disturbs it. We won't sand or cut into a pre-1990 ceiling texture until that's been done.
My basement drywall got wet. Can you just replace that section?
We can, but not before the water source is dealt with. Replacing wet drywall over an active leak or an ongoing moisture problem buys a few months and then the repair fails again. On the quote visit we'll look at where the water is coming from and tell you straight whether the repair should wait — even if that means we don't start that week.
When is the best time to repaint the outside of a PoCo house?
Between about April and early October. Most exterior acrylic paints specify a minimum application temperature — commonly 10°C, with some low-temperature formulations rated lower — and the surface has to stay dry long enough for the film to cure. In this climate that realistically means the dry stretch from mid-spring to early autumn, which is also when everybody books, so early enquiries get the better slots.
Sources & further reading
Regulations and municipal requirements change. Confirm anything that affects your project with your municipality before work starts.
Tell us about your project.
Fill this out and Rob will get back to you — usually the same day — to set up a free, no-pressure on-site quote. Prefer to talk? Call or text anytime.

Got a project in mind? Let’s take a look.
Tell us what you’re thinking and Rob will come by for a free on-site quote — clear pricing, honest advice, zero pressure.